Map of Canada

Tax Sale Property.ca

Free official tax sale property listings across Canada

Calendar Map

500 Robson Street

Fairview No. 136, Alberta

Minimum Tender
$12.00
Closing
2026-06-10
Property Type
Unknown
Tax Arrears
Not published
Assessed Value
Not published
Sale Date
2026-06-10
Auction
Not published

Legal Description: Lot LINC Block Address Plan Reserve Bid; Lot 5 Block 4061EO Plan 942245071; Lot 404 Connaught Block Drive Plan $9,619,000; Lot to GST. The Municipality of Jasper makes no representation and gives no warranty Block whatsoever regarding the adequacy of services, the condition of the building, soil Plan conditions, land use districting, building and development conditions, absence or; Lot intended use by the purchaser. The Municipality of Jasper reserves the right to reject Block any or all offers. Plan The Municipality of Jasper may, after the public auction, become the owner of the

Roll Number: 942245071

Sale Type: public tender

Rural/Urban: Not published

Lot Information: Not published

Assessment Information: Not published

Municipality Contact: Not published

Full Official Sale Listing

 
      

  






The Alberta Gazette
Part I
Vol. 122	Edmonton, Thursday, April 30, 2026	No. 08
APPOINTMENTS
Appointment of Non-Presiding Justice of the Peace
(Justice of the Peace Act)
April 2, 2026 
Fedyniak, Sara Marie of Fort Saskatchewan 
Flores, Justin Jerone Chavez of St. Paul 
Glasgow, Deanna Rhae of Red Deer 
Grewal, Navdeep Kaur of Calgary 
Hepp, Kyla Brianne of Calgary 
Khehra, Avneet Kaur of Calgary 
Perry, Owen William of Edmonton
GOVERNMENT NOTICES
Agriculture and Irrigation
Form 15
(Irrigation Districts Act) 
(Section 88)
Notice to Irrigation Secretariat: 
Change of Area of an Irrigation District
On behalf of the St. Mary River Irrigation District, I hereby request that the 
Irrigation Secretariat forward a certified copy of this notice to the Registrar of Land 
Titles for the purposes of registration under section 22 of the Land Titles Act and 
arrange for notice to be published in the Alberta Gazette.
The following parcels of land should be added to the irrigation district and the 
appropriate notation added to the certificate of title:
LINC Number
Short Legal Description as shown on title
Title Number
0022 709 357
4;12;8;17;SW
021 358 674
I certify the procedures required under part 4 of the Irrigation Districts Act have been 
completed and the area of the St. Mary River Irrigation District should be changed 
according to the above list.
Rebecca Fast, Office Administrator, 
Irrigation Secretariat.
______________
On behalf of the Western Irrigation District, I hereby request that the Irrigation 
Secretariat forward a certified copy of this notice to the Registrar of Land Titles for 
the purposes of registration under section 22 of the Land Titles Act and arrange for 
notice to be published in the Alberta Gazette.
The following parcels of land should be added to the irrigation district and the 
appropriate notation added to the certificate of title:
LINC Number
Short Legal Description as shown on title
Title Number
0016 836 983
4;21;23;27;SW
941 116 635
0018 423 046
4;20;21;31;NW
081 095 763
0018 423 054
4;20;21;31;NE
081 095 763
0019 045 344
1605FE;B;D
011 325 375
0021 482 294
4;20;21;31;SE
011 325 375+1
0021 848 395
4;25;27;21;NE
211 111 592+15
0021 848 403
4;25;27;22;NE
021 070 604
0022 144 604
4;21;23;27;SE
941 116 635+2
0027 215 830
4;21;23;27;NE
981 265 791+1
0027 602 151
4;21;23;27;NW
981 265 791+1
I certify the procedures required under part 4 of the Irrigation Districts Act have been 
completed and the area of the Western Irrigation District should be changed 
according to the above list.
Rebecca Fast, Office Administrator, 
Irrigation Secretariat.
Assisted Living and Social Services
Office of the Public Guardian and Trustee
Interest Rate on Public Trustee Guaranteed Accounts
(Public Trustee Act)
The following information is provided in accordance with section 2(3) of the Public 
Trustee Investment Regulation for the fiscal year ending March 31, 2026:
(a) The average effective annual interest rate paid by the Public Trustee on guaranteed 
accounts during the year was 2.76%.
(b) The average reference rate during the year was 2.58%.
(c) The ratio of the average referred to in (a) to the average referred to in (b), 
expressed as a percentage rounded to the first decimal place is 107.1%.
Linda Camminatore, Public Trustee 
Office of the Public Guardian and Trustee.
Office of the Public Guardian and Trustee
Property being held by the Public Trustee for a period of Ten (10) Years 
(Public Trustee Act)
Section 11(2)(b)
Name of Person Entitled 
to Property
Description of 
Property held 
and its value or 
estimated value
Property part of 
deceased person's  
Estate or held under 
Court Order:
Deceased's Name 
Judicial District 
Court file number
Public Trustee 
Office 
 
Additional 
Information 
Ron Bradley
$7,817.07
Thomas George 
Wikinson 
(File 80912 with 
Burnham Law Group) 
DES-005212 
Grande Prairie
E183370
Sandra Helen Piche
$3,212.86
Judy Ann Piche 
(File 163701) 
SES12 34911 
Wetaskiwin
E179798
Energy and Minerals
Declaration of Withdrawal from Unit Agreement
(Petroleum and Natural Gas Tenure Regulations)
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta 
hereby declares and states that the Crown has withdrawn as a party to the agreement 
"Huxley Duvernay Agreement" effective January 31, 2026.
Alexis Pike, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta 
hereby declares and states that the Crown has withdrawn as a party to the agreement 
"Swimming Mclaren Agreement No. 6" effective March 31, 2026.
Alexis Pike, for Minister of Energy and Minerals.
Production Allocation Unit Agreement
(Mines and Minerals Act)
Notice is hereby given, pursuant to section 102 of the Mines and Minerals Act, that 
the Minister of Energy and Minerals on behalf of the Crown has executed 
counterparts of the agreement entitled "Production Allocation Unit Agreement - 
Herronton Glauconitic Agreement No. 9" and that the Unit became effective on 
June 1, 2024.
 
 
 
 
 
Notice is hereby given, pursuant to section 102 of the Mines and Minerals Act, that 
the Minister of Energy and Minerals on behalf of the Crown has executed 
counterparts of the agreement entitled "Production Allocation Unit Agreement - 
Leduc-Woodbend Mannville Agreement" and that the Unit became effective on 
April 1, 2025.
 
 
 
 
Infrastructure
Contract Increases Approved Pursuant to Treasury Board Directive 02/2005
Contract: Calgary - Various Group Homes - Exterior Upgrades
Contractor: Home Sweet Homes
Reason for Increase: Hidden structural damage has been identified behind stucco on 
group homes that needs to be repaired to maintain longevity of the houses.
Contract Amount: $750,000.00
% Increase: 27%
Amount of Increase: $200,000.00
Contract: Edmonton - Alberta Innovates Millwoods ARC Lab/Admin Building - Air 
Handling System Replacement
Contractor: Setanta Contracting Ltd.
Reason for Increase: During construction unforeseen concealed hazardous materials 
were discovered that require abatement. As well, some of the structural supports for 
the air handling units were not constructed per records, requiring structural 
modifications to ensure equipment was safely supported.
Contract Amount: $1,520,000.00
% Increase: 13%
Amount of Increase: $190,000.00
Contract: Edmonton - Former Edmonton Remand Centre Abatement and Demolition
Contractor: Graham Design Builders
Reason for Increase: This contract tolerance increase is requested to address 
concealed hazardous materials encountered during demolition requiring abatement. 
The unforeseen abatement requires the contractor to expend additional resources 
(cost) and the abatement delays progressing with the demolition scope (valid schedule 
extension). This increase is within the current TPC and accounts for future risks.
Contract Amount: $16,500,000.00
% Increase: 87%
Amount of Increase: $14,300,000.00
Contract: Edmonton - Infra. Bldg - Relocate Transportation to Infra. Bldg. - 
Demo/Abatement
Contractor: North Elm Construction
Reason for Increase: An increase in tolerance is required to approve the change 
orders associated with the additional scope added to the project. This includes fire 
spray on the main floor, the Phase 3 addition, and anticipated additional glue scraping 
similar to the second floor. The overall tolerance remains within the project's current 
Total Project Cost (TPC). NorthElm is actively working with AI to meet timelines. 
Other options have been explored to bring in a different contract but in the interest of 
time and cost we have chosen to continue with NorthElm to not further delay other 
projects in the building.
Contract Amount: $3,212,896.00
% Increase: 154%
Amount of Increase: $4,939,660.40
Contract: Edmonton - John E Brownlee Building - ACPS Part 2 - Restack of 5th 
Floor
Contractor: Govan Brown & Associates Ltd.
Reason for Increase: A request is being made to increase the contractor's tolerance 
to accommodate the remaining change orders necessary for the completion of the 5th 
floor project. This includes outstanding window film installation, additional electrical 
work, enhancements to the sound-masking system, and upgrades to the duress system. 
The requested increase remains within the currently approved total project budget.
Contract Amount: $3,728,970.00
% Increase: 52%
Amount of Increase: $1,927,415.28
Contract: Fort Saskatchewan - Provincial Warehouse Renovation - Sheriffs 
Quartermaster Depot
Contractor: Graham Design Builders LP
Reason for Increase: A contract tolerance increase is required due to a construction 
pause resulting from the re-occurrence of previously repaired site conditions. The 
additional funds relate to a pending change order covering costs incurred during the 
construction pause while further repairs were undertaken. The request also includes 
contingency to address potential unknown conditions through to construction 
completion. Requested increase is within the current Total Project Costs (TPC).
Contract Amount: $7,691,800.00
% Increase: 57%
Amount of Increase: $4,362,632.24
Contract: Strathmore - New Leased Space - PSES Move Out of Jackson Business 
Centre
Contractor: Cormac
Reason for Increase: The increase is required to complete the monorail/freezer 
system and incorporate additional card readers and security hardware that differ from 
the original design. These enhanced security measures were requested by the client to 
meet program-specific requirements.
Contract Amount: $622,300.00
% Increase: 24%
Amount of Increase: $150,000.00
Contract: Sturgeon County - Poundmaker Lodge - Washroom Modernization
Contractor: Revive Construction Inc.
Reason for Increase: The increase in tolerance is requested solely to address the 
remaining change orders required to complete the project. This includes unforeseen 
mold discovered after opening walls in the washrooms and ceilings, as well as 
modifications to the ceilings in two meeting rooms to accommodate new lighting. The 
requested increase remains within the currently approved total budget.
Contract Amount: $1,580,200.00
% Increase: 25%
Amount of Increase: $397,585.94
Mental Health and Addiction
Ministerial Order No. 4/2026
(Special Days Act)
    I, Rick Wilson, Minister of Mental Health and Addiction, pursuant to section 
3(1)(b) of the Special Days Act, hereby declare the second full week of May as Drug 
Awareness Week in perpetuity in the Province of Alberta.
Dated at Edmonton, Alberta this 13th day of April, 2026.
Rick Wilson, Minister
Safety Codes Council
Corporate Accreditation - Cancellation
(Safety Codes Act)
Pursuant to Section 28 of the Safety Codes Act it is hereby ordered that
Heartland Generation Ltd., Accreditation No. C000236, Order No. 1318
Is to cease services under the Safety Codes Act for Electrical
Consisting of all parts of the CSA C22.1-21 Canadian Electrical Code (25th Edition) 
& Alberta Electrical Utility Code (6th Edition, 2022) as amended from time to time.
		Issued Date: April 1, 2026.
_______________
Pursuant to Section 28 of the Safety Codes Act it is hereby ordered that
Heartland Generation Ltd., Accreditation No. C000236, Order No. 1358
Is to cease services under the Safety Codes Act for Fire
Consisting of all parts of the National Fire Code - 2019 Alberta Edition, and Fire 
Investigation (cause and circumstance) as amended from time to time.
		Issued Date: April 1, 2026.
Alberta Securities Commission
AMENDMENTS TO MULTILATERAL INSTRUMENT 25-102 
DESIGNATED BENCHMARKS AND BENCHMARK ADMINISTRATORS
(Securities Act)
Made as a rule by the Alberta Securities Commission on January 14, 2026 pursuant to 
sections 223 and 224 of the Securities Act.
AMENDMENTS TO MULTILATERAL INSTRUMENT 25-102 
DESIGNATED BENCHMARKS AND BENCHMARK ADMINISTRATORS
1.	Multilateral Instrument 25-102 Designated Benchmarks and Benchmark 
Administrators is amended by this Instrument.
2.	Subsection 1(1) is amended by repealing the definitions of "CSAE 3000", 
"CSAE 3001", "CSAE 3530", "CSAE 3531", "ISAE 3000", "limited 
assurance report on compliance", and "reasonable assurance report on 
compliance".
3.	Subsection 1(1) is amended by adding the following definition:
"reasonable assurance report on controls" means a report prepared on a 
reasonable assurance basis
(a)	by a public accountant, on the statement of an individual or management of 
a person or company, as applicable, that 
(i)	relates to the description, design and implementation of policies, 
procedures and controls by the individual or management with respect 
to applicable subject requirements, and 
(ii)	states whether those policies, procedures and controls operated 
effectively over the applicable period, and
(b)	in accordance with 
(i)	the Handbook, or 
(ii)	International Standards on Assurance Engagements set by the 
International Auditing and Assurance Standards Board, as amended 
from time to time;.
4.	Subsection 1(1) is amended in the definition of "subject requirements":
(a)	by adding the following paragraph:
(a.0)	paragraphs 13.1(1)(a) and (b);, and 
(b)	by repealing paragraphs (c) and (d) and substituting the following:
(c)	paragraphs 36(1)(a), (b) and (c),
(d)	paragraphs 37(1)(a), (b) and (c),.
5.	Paragraph 5(2)(b) is amended by replacing ", a public accountant's limited 
assurance report on compliance or a reasonable assurance report on compliance" 
with "or a reasonable assurance report on controls".
6.	Paragraphs 7(8)(f) and (g) are amended by replacing ", or any public 
accountant's limited assurance report on compliance or reasonable assurance 
report on compliance" with "or any reasonable assurance report on controls".
7.	The following section is added:
Assurance report on designated benchmark administrator
13.1(1)	A designated benchmark administrator must engage a public accountant 
to provide a reasonable assurance report on controls, in respect of each 
designated benchmark it administers that is not a designated critical 
benchmark, a designated interest rate benchmark or a designated 
commodity benchmark, relating to
(a)	the designated benchmark administrator's compliance with sections 
5, 8 to 16 and 26, and
(b)	whether the designated benchmark administrator follows the 
methodology of the designated benchmark. 
(2)	For the purposes of subsection (1), the applicable period of a report 
referred to in that subsection is,
(a) 	in the case of a first report, the period commencing 9 months and one 
day after the date of designation of a benchmark referred to in that 
subsection and ending 12 months after that date, and 
(b) 	in the case of a report that is not the first report, the period 
commencing 12 months and one day after the end of the applicable 
period of the report preceding the subsequent report and ending 24 
months after the end of that period.
(3)	For the purposes of subsection (1), an engagement referred to in that 
subsection must require a public accountant to provide a report referred to 
in that subsection to the designated benchmark administrator not later 
than 90 days after the end of the applicable period under subsection (2).
(4)	For the purposes of subsection (1), a designated benchmark administrator 
must, not later than 100 days after the end of the applicable period under 
subsection (2) of a report referred to in subsection (1), publish the report 
and deliver a copy of the report to the regulator or securities regulatory 
authority..
8.	Paragraphs 24(4)(f), 24(5)(a) and (b) and 26(3)(b) are amended by replacing 
"limited assurance report on compliance or reasonable assurance report on 
compliance" with "reasonable assurance report on controls".
9.	Section 32 is repealed and the following substituted:
Assurance report on designated benchmark administrator
32.(1)	A designated benchmark administrator must engage a public accountant 
to provide a reasonable assurance report on controls, in respect of each 
designated critical benchmark it administers, relating to 
(a)	the designated benchmark administrator's compliance with sections 
5, 8 to 16 and 26, and
(b)	whether the designated benchmark administrator follows the 
methodology of the designated critical benchmark.
(2)	For the purposes of subsection (1), the applicable period of a report 
referred to in that subsection is,
(a)	in the case of a first report, the period commencing 9 months and one 
day after the date of designation of a benchmark referred to in that 
subsection and ending 12 months after that date, and
(b)	in the case of a report that is not the first report, the period 
commencing on the first day after the end of the applicable period of 
the report preceding the subsequent report and ending 12 months 
after the end of that period. 
(3)	For the purposes of subsection (1), an engagement referred to in that 
subsection must require a public accountant to provide a report referred to 
in that subsection to the designated benchmark administrator not later 
than 90 days after the end of the applicable period under subsection (2).
(4)	For the purposes of subsection (1), a designated benchmark administrator 
must, not later than 100 days after the end of the applicable period under 
subsection (2) of a report referred to in subsection (1), publish the report 
and deliver a copy of the report to the regulator or securities regulatory 
authority..
10.	Section 33 is repealed and the following substituted:
Assurance report on benchmark contributor requested by oversight 
committee	
33.(1)	If requested by the oversight committee referred to in section 7 as a result 
of a concern relating to a benchmark contributor to a designated critical 
benchmark, the benchmark contributor must engage a public accountant 
to provide a reasonable assurance report on controls relating to 
(a)	the benchmark contributor's compliance with section 24, and
(b)	whether the benchmark contributor follows the methodology of the 
designated critical benchmark. 
(2)	For the purposes of subsection (1), the applicable period of a report 
referred to in that subsection is 3 months, 6 months, 9 months or 12 
months, as specified in a request referred to in that subsection.
(3)	For the purposes of subsection (1), an engagement referred to in that 
subsection must require a public accountant to provide a report referred to 
in that subsection to the benchmark contributor not later than 90 days 
after a request referred to in that subsection.
(4)	For the purposes of subsection (1), a benchmark contributor must, not 
later than 100 days after a request of the oversight committee referred to 
in that subsection, deliver a copy of a report referred to in that subsection 
to
(a)	the oversight committee,
(b)	the board of directors of the designated benchmark administrator that 
established the oversight committee referred to in paragraph (a), and 
(c)	the regulator or securities regulatory authority..
11.	Section 36 is repealed and the following substituted:
Assurance report on designated benchmark administrator
36.(1)	A designated benchmark administrator must engage a public accountant 
to provide a reasonable assurance report on controls, in respect of each 
designated interest rate benchmark it administers, relating to 
(a)	the designated benchmark administrator's compliance with sections 
5, 8 to 16, 26 and 34, 
(b)	for a benchmark with a benchmark contributor, the designated 
benchmark administrator's compliance with section 23, and
(c)	whether the designated benchmark administrator follows the 
methodology of the designated interest rate benchmark. 
(2)	For the purposes of subsection (1), the applicable period of a report 
referred to in that subsection is,
(a)	in the case of a first report,
(i)	for a benchmark with a benchmark contributor, the period 
commencing 3 months and one day after the date of designation 
of the benchmark and ending 6 months after that date, or
(ii)	for a benchmark without a benchmark contributor, the period 
commencing 9 months a...