500 Robson Street
Fairview No. 136, Alberta
$12.00
2026-06-10
Unknown
Not published
Not published
2026-06-10
Not published
Legal Description: Lot LINC Block Address Plan Reserve Bid; Lot 5 Block 4061EO Plan 942245071; Lot 404 Connaught Block Drive Plan $9,619,000; Lot to GST. The Municipality of Jasper makes no representation and gives no warranty Block whatsoever regarding the adequacy of services, the condition of the building, soil Plan conditions, land use districting, building and development conditions, absence or; Lot intended use by the purchaser. The Municipality of Jasper reserves the right to reject Block any or all offers. Plan The Municipality of Jasper may, after the public auction, become the owner of the
Roll Number: 942245071
Sale Type: public tender
Rural/Urban: Not published
Lot Information: Not published
Assessment Information: Not published
Municipality Contact: Not published
Full Official Sale Listing
The Alberta Gazette
Part I
Vol. 122 Edmonton, Thursday, April 30, 2026 No. 08
APPOINTMENTS
Appointment of Non-Presiding Justice of the Peace
(Justice of the Peace Act)
April 2, 2026
Fedyniak, Sara Marie of Fort Saskatchewan
Flores, Justin Jerone Chavez of St. Paul
Glasgow, Deanna Rhae of Red Deer
Grewal, Navdeep Kaur of Calgary
Hepp, Kyla Brianne of Calgary
Khehra, Avneet Kaur of Calgary
Perry, Owen William of Edmonton
GOVERNMENT NOTICES
Agriculture and Irrigation
Form 15
(Irrigation Districts Act)
(Section 88)
Notice to Irrigation Secretariat:
Change of Area of an Irrigation District
On behalf of the St. Mary River Irrigation District, I hereby request that the
Irrigation Secretariat forward a certified copy of this notice to the Registrar of Land
Titles for the purposes of registration under section 22 of the Land Titles Act and
arrange for notice to be published in the Alberta Gazette.
The following parcels of land should be added to the irrigation district and the
appropriate notation added to the certificate of title:
LINC Number
Short Legal Description as shown on title
Title Number
0022 709 357
4;12;8;17;SW
021 358 674
I certify the procedures required under part 4 of the Irrigation Districts Act have been
completed and the area of the St. Mary River Irrigation District should be changed
according to the above list.
Rebecca Fast, Office Administrator,
Irrigation Secretariat.
______________
On behalf of the Western Irrigation District, I hereby request that the Irrigation
Secretariat forward a certified copy of this notice to the Registrar of Land Titles for
the purposes of registration under section 22 of the Land Titles Act and arrange for
notice to be published in the Alberta Gazette.
The following parcels of land should be added to the irrigation district and the
appropriate notation added to the certificate of title:
LINC Number
Short Legal Description as shown on title
Title Number
0016 836 983
4;21;23;27;SW
941 116 635
0018 423 046
4;20;21;31;NW
081 095 763
0018 423 054
4;20;21;31;NE
081 095 763
0019 045 344
1605FE;B;D
011 325 375
0021 482 294
4;20;21;31;SE
011 325 375+1
0021 848 395
4;25;27;21;NE
211 111 592+15
0021 848 403
4;25;27;22;NE
021 070 604
0022 144 604
4;21;23;27;SE
941 116 635+2
0027 215 830
4;21;23;27;NE
981 265 791+1
0027 602 151
4;21;23;27;NW
981 265 791+1
I certify the procedures required under part 4 of the Irrigation Districts Act have been
completed and the area of the Western Irrigation District should be changed
according to the above list.
Rebecca Fast, Office Administrator,
Irrigation Secretariat.
Assisted Living and Social Services
Office of the Public Guardian and Trustee
Interest Rate on Public Trustee Guaranteed Accounts
(Public Trustee Act)
The following information is provided in accordance with section 2(3) of the Public
Trustee Investment Regulation for the fiscal year ending March 31, 2026:
(a) The average effective annual interest rate paid by the Public Trustee on guaranteed
accounts during the year was 2.76%.
(b) The average reference rate during the year was 2.58%.
(c) The ratio of the average referred to in (a) to the average referred to in (b),
expressed as a percentage rounded to the first decimal place is 107.1%.
Linda Camminatore, Public Trustee
Office of the Public Guardian and Trustee.
Office of the Public Guardian and Trustee
Property being held by the Public Trustee for a period of Ten (10) Years
(Public Trustee Act)
Section 11(2)(b)
Name of Person Entitled
to Property
Description of
Property held
and its value or
estimated value
Property part of
deceased person's
Estate or held under
Court Order:
Deceased's Name
Judicial District
Court file number
Public Trustee
Office
Additional
Information
Ron Bradley
$7,817.07
Thomas George
Wikinson
(File 80912 with
Burnham Law Group)
DES-005212
Grande Prairie
E183370
Sandra Helen Piche
$3,212.86
Judy Ann Piche
(File 163701)
SES12 34911
Wetaskiwin
E179798
Energy and Minerals
Declaration of Withdrawal from Unit Agreement
(Petroleum and Natural Gas Tenure Regulations)
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
"Huxley Duvernay Agreement" effective January 31, 2026.
Alexis Pike, for Minister of Energy and Minerals.
_______________
The Minister of Energy and Minerals on behalf of the Crown in Right of Alberta
hereby declares and states that the Crown has withdrawn as a party to the agreement
"Swimming Mclaren Agreement No. 6" effective March 31, 2026.
Alexis Pike, for Minister of Energy and Minerals.
Production Allocation Unit Agreement
(Mines and Minerals Act)
Notice is hereby given, pursuant to section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Herronton Glauconitic Agreement No. 9" and that the Unit became effective on
June 1, 2024.
Notice is hereby given, pursuant to section 102 of the Mines and Minerals Act, that
the Minister of Energy and Minerals on behalf of the Crown has executed
counterparts of the agreement entitled "Production Allocation Unit Agreement -
Leduc-Woodbend Mannville Agreement" and that the Unit became effective on
April 1, 2025.
Infrastructure
Contract Increases Approved Pursuant to Treasury Board Directive 02/2005
Contract: Calgary - Various Group Homes - Exterior Upgrades
Contractor: Home Sweet Homes
Reason for Increase: Hidden structural damage has been identified behind stucco on
group homes that needs to be repaired to maintain longevity of the houses.
Contract Amount: $750,000.00
% Increase: 27%
Amount of Increase: $200,000.00
Contract: Edmonton - Alberta Innovates Millwoods ARC Lab/Admin Building - Air
Handling System Replacement
Contractor: Setanta Contracting Ltd.
Reason for Increase: During construction unforeseen concealed hazardous materials
were discovered that require abatement. As well, some of the structural supports for
the air handling units were not constructed per records, requiring structural
modifications to ensure equipment was safely supported.
Contract Amount: $1,520,000.00
% Increase: 13%
Amount of Increase: $190,000.00
Contract: Edmonton - Former Edmonton Remand Centre Abatement and Demolition
Contractor: Graham Design Builders
Reason for Increase: This contract tolerance increase is requested to address
concealed hazardous materials encountered during demolition requiring abatement.
The unforeseen abatement requires the contractor to expend additional resources
(cost) and the abatement delays progressing with the demolition scope (valid schedule
extension). This increase is within the current TPC and accounts for future risks.
Contract Amount: $16,500,000.00
% Increase: 87%
Amount of Increase: $14,300,000.00
Contract: Edmonton - Infra. Bldg - Relocate Transportation to Infra. Bldg. -
Demo/Abatement
Contractor: North Elm Construction
Reason for Increase: An increase in tolerance is required to approve the change
orders associated with the additional scope added to the project. This includes fire
spray on the main floor, the Phase 3 addition, and anticipated additional glue scraping
similar to the second floor. The overall tolerance remains within the project's current
Total Project Cost (TPC). NorthElm is actively working with AI to meet timelines.
Other options have been explored to bring in a different contract but in the interest of
time and cost we have chosen to continue with NorthElm to not further delay other
projects in the building.
Contract Amount: $3,212,896.00
% Increase: 154%
Amount of Increase: $4,939,660.40
Contract: Edmonton - John E Brownlee Building - ACPS Part 2 - Restack of 5th
Floor
Contractor: Govan Brown & Associates Ltd.
Reason for Increase: A request is being made to increase the contractor's tolerance
to accommodate the remaining change orders necessary for the completion of the 5th
floor project. This includes outstanding window film installation, additional electrical
work, enhancements to the sound-masking system, and upgrades to the duress system.
The requested increase remains within the currently approved total project budget.
Contract Amount: $3,728,970.00
% Increase: 52%
Amount of Increase: $1,927,415.28
Contract: Fort Saskatchewan - Provincial Warehouse Renovation - Sheriffs
Quartermaster Depot
Contractor: Graham Design Builders LP
Reason for Increase: A contract tolerance increase is required due to a construction
pause resulting from the re-occurrence of previously repaired site conditions. The
additional funds relate to a pending change order covering costs incurred during the
construction pause while further repairs were undertaken. The request also includes
contingency to address potential unknown conditions through to construction
completion. Requested increase is within the current Total Project Costs (TPC).
Contract Amount: $7,691,800.00
% Increase: 57%
Amount of Increase: $4,362,632.24
Contract: Strathmore - New Leased Space - PSES Move Out of Jackson Business
Centre
Contractor: Cormac
Reason for Increase: The increase is required to complete the monorail/freezer
system and incorporate additional card readers and security hardware that differ from
the original design. These enhanced security measures were requested by the client to
meet program-specific requirements.
Contract Amount: $622,300.00
% Increase: 24%
Amount of Increase: $150,000.00
Contract: Sturgeon County - Poundmaker Lodge - Washroom Modernization
Contractor: Revive Construction Inc.
Reason for Increase: The increase in tolerance is requested solely to address the
remaining change orders required to complete the project. This includes unforeseen
mold discovered after opening walls in the washrooms and ceilings, as well as
modifications to the ceilings in two meeting rooms to accommodate new lighting. The
requested increase remains within the currently approved total budget.
Contract Amount: $1,580,200.00
% Increase: 25%
Amount of Increase: $397,585.94
Mental Health and Addiction
Ministerial Order No. 4/2026
(Special Days Act)
I, Rick Wilson, Minister of Mental Health and Addiction, pursuant to section
3(1)(b) of the Special Days Act, hereby declare the second full week of May as Drug
Awareness Week in perpetuity in the Province of Alberta.
Dated at Edmonton, Alberta this 13th day of April, 2026.
Rick Wilson, Minister
Safety Codes Council
Corporate Accreditation - Cancellation
(Safety Codes Act)
Pursuant to Section 28 of the Safety Codes Act it is hereby ordered that
Heartland Generation Ltd., Accreditation No. C000236, Order No. 1318
Is to cease services under the Safety Codes Act for Electrical
Consisting of all parts of the CSA C22.1-21 Canadian Electrical Code (25th Edition)
& Alberta Electrical Utility Code (6th Edition, 2022) as amended from time to time.
Issued Date: April 1, 2026.
_______________
Pursuant to Section 28 of the Safety Codes Act it is hereby ordered that
Heartland Generation Ltd., Accreditation No. C000236, Order No. 1358
Is to cease services under the Safety Codes Act for Fire
Consisting of all parts of the National Fire Code - 2019 Alberta Edition, and Fire
Investigation (cause and circumstance) as amended from time to time.
Issued Date: April 1, 2026.
Alberta Securities Commission
AMENDMENTS TO MULTILATERAL INSTRUMENT 25-102
DESIGNATED BENCHMARKS AND BENCHMARK ADMINISTRATORS
(Securities Act)
Made as a rule by the Alberta Securities Commission on January 14, 2026 pursuant to
sections 223 and 224 of the Securities Act.
AMENDMENTS TO MULTILATERAL INSTRUMENT 25-102
DESIGNATED BENCHMARKS AND BENCHMARK ADMINISTRATORS
1. Multilateral Instrument 25-102 Designated Benchmarks and Benchmark
Administrators is amended by this Instrument.
2. Subsection 1(1) is amended by repealing the definitions of "CSAE 3000",
"CSAE 3001", "CSAE 3530", "CSAE 3531", "ISAE 3000", "limited
assurance report on compliance", and "reasonable assurance report on
compliance".
3. Subsection 1(1) is amended by adding the following definition:
"reasonable assurance report on controls" means a report prepared on a
reasonable assurance basis
(a) by a public accountant, on the statement of an individual or management of
a person or company, as applicable, that
(i) relates to the description, design and implementation of policies,
procedures and controls by the individual or management with respect
to applicable subject requirements, and
(ii) states whether those policies, procedures and controls operated
effectively over the applicable period, and
(b) in accordance with
(i) the Handbook, or
(ii) International Standards on Assurance Engagements set by the
International Auditing and Assurance Standards Board, as amended
from time to time;.
4. Subsection 1(1) is amended in the definition of "subject requirements":
(a) by adding the following paragraph:
(a.0) paragraphs 13.1(1)(a) and (b);, and
(b) by repealing paragraphs (c) and (d) and substituting the following:
(c) paragraphs 36(1)(a), (b) and (c),
(d) paragraphs 37(1)(a), (b) and (c),.
5. Paragraph 5(2)(b) is amended by replacing ", a public accountant's limited
assurance report on compliance or a reasonable assurance report on compliance"
with "or a reasonable assurance report on controls".
6. Paragraphs 7(8)(f) and (g) are amended by replacing ", or any public
accountant's limited assurance report on compliance or reasonable assurance
report on compliance" with "or any reasonable assurance report on controls".
7. The following section is added:
Assurance report on designated benchmark administrator
13.1(1) A designated benchmark administrator must engage a public accountant
to provide a reasonable assurance report on controls, in respect of each
designated benchmark it administers that is not a designated critical
benchmark, a designated interest rate benchmark or a designated
commodity benchmark, relating to
(a) the designated benchmark administrator's compliance with sections
5, 8 to 16 and 26, and
(b) whether the designated benchmark administrator follows the
methodology of the designated benchmark.
(2) For the purposes of subsection (1), the applicable period of a report
referred to in that subsection is,
(a) in the case of a first report, the period commencing 9 months and one
day after the date of designation of a benchmark referred to in that
subsection and ending 12 months after that date, and
(b) in the case of a report that is not the first report, the period
commencing 12 months and one day after the end of the applicable
period of the report preceding the subsequent report and ending 24
months after the end of that period.
(3) For the purposes of subsection (1), an engagement referred to in that
subsection must require a public accountant to provide a report referred to
in that subsection to the designated benchmark administrator not later
than 90 days after the end of the applicable period under subsection (2).
(4) For the purposes of subsection (1), a designated benchmark administrator
must, not later than 100 days after the end of the applicable period under
subsection (2) of a report referred to in subsection (1), publish the report
and deliver a copy of the report to the regulator or securities regulatory
authority..
8. Paragraphs 24(4)(f), 24(5)(a) and (b) and 26(3)(b) are amended by replacing
"limited assurance report on compliance or reasonable assurance report on
compliance" with "reasonable assurance report on controls".
9. Section 32 is repealed and the following substituted:
Assurance report on designated benchmark administrator
32.(1) A designated benchmark administrator must engage a public accountant
to provide a reasonable assurance report on controls, in respect of each
designated critical benchmark it administers, relating to
(a) the designated benchmark administrator's compliance with sections
5, 8 to 16 and 26, and
(b) whether the designated benchmark administrator follows the
methodology of the designated critical benchmark.
(2) For the purposes of subsection (1), the applicable period of a report
referred to in that subsection is,
(a) in the case of a first report, the period commencing 9 months and one
day after the date of designation of a benchmark referred to in that
subsection and ending 12 months after that date, and
(b) in the case of a report that is not the first report, the period
commencing on the first day after the end of the applicable period of
the report preceding the subsequent report and ending 12 months
after the end of that period.
(3) For the purposes of subsection (1), an engagement referred to in that
subsection must require a public accountant to provide a report referred to
in that subsection to the designated benchmark administrator not later
than 90 days after the end of the applicable period under subsection (2).
(4) For the purposes of subsection (1), a designated benchmark administrator
must, not later than 100 days after the end of the applicable period under
subsection (2) of a report referred to in subsection (1), publish the report
and deliver a copy of the report to the regulator or securities regulatory
authority..
10. Section 33 is repealed and the following substituted:
Assurance report on benchmark contributor requested by oversight
committee
33.(1) If requested by the oversight committee referred to in section 7 as a result
of a concern relating to a benchmark contributor to a designated critical
benchmark, the benchmark contributor must engage a public accountant
to provide a reasonable assurance report on controls relating to
(a) the benchmark contributor's compliance with section 24, and
(b) whether the benchmark contributor follows the methodology of the
designated critical benchmark.
(2) For the purposes of subsection (1), the applicable period of a report
referred to in that subsection is 3 months, 6 months, 9 months or 12
months, as specified in a request referred to in that subsection.
(3) For the purposes of subsection (1), an engagement referred to in that
subsection must require a public accountant to provide a report referred to
in that subsection to the benchmark contributor not later than 90 days
after a request referred to in that subsection.
(4) For the purposes of subsection (1), a benchmark contributor must, not
later than 100 days after a request of the oversight committee referred to
in that subsection, deliver a copy of a report referred to in that subsection
to
(a) the oversight committee,
(b) the board of directors of the designated benchmark administrator that
established the oversight committee referred to in paragraph (a), and
(c) the regulator or securities regulatory authority..
11. Section 36 is repealed and the following substituted:
Assurance report on designated benchmark administrator
36.(1) A designated benchmark administrator must engage a public accountant
to provide a reasonable assurance report on controls, in respect of each
designated interest rate benchmark it administers, relating to
(a) the designated benchmark administrator's compliance with sections
5, 8 to 16, 26 and 34,
(b) for a benchmark with a benchmark contributor, the designated
benchmark administrator's compliance with section 23, and
(c) whether the designated benchmark administrator follows the
methodology of the designated interest rate benchmark.
(2) For the purposes of subsection (1), the applicable period of a report
referred to in that subsection is,
(a) in the case of a first report,
(i) for a benchmark with a benchmark contributor, the period
commencing 3 months and one day after the date of designation
of the benchmark and ending 6 months after that date, or
(ii) for a benchmark without a benchmark contributor, the period
commencing 9 months a...